January 23-29, 2006

We have been in construction for one week and much has happened.  

south walls halfbath open.JPG (379211 bytes) South wall comes down.   The half bath will become a pantry.

south window removed.JPG (349690 bytes) Stained glass window removed, wall opened up.

Notice the pipe coming down from the upstairs bathroom.  This may be a problem.  With the wall coming down to open up the kitchen we will need to move this pipe.  

Space behind frige.JPG (381401 bytes) Space behind the refrigerator

This small space held our shower before we added the new full bath on the first floor.  This 30" X 30" stall was claustrophobic.  And, it was our only shower in the house.  We are happy to see it go!

ceiling exposed.JPG (407758 bytes)Ceiling exposed

These rafters will have to be replaced.  They are too far apart and may cause problems for us down the road.